Crossway Industrial

Crossway Industrial7880 Crossway Drive, Pico Rivera, CA General Contractor:C.E.G. Construction Architect: O.C. Design & Engineering Engineer: O.C. Design & Engineering Steel Scope:Structural & Miscellaneous steel Completion Year:2008 Category:Warehouse Tons of Steel145 Crossway Industrial 7880 Crossway Drive, Pico Rivera, CA 44,670 Sq ft concrete tilt-up industrial Building. 145 Tons of steel Item #5

TVC Parking Facility

TVC Parking Facility6300 Romaine Street, Los Angeles, CA General Contractor:Parker Brown, Inc Architect: Turkel Architecture Engineer: O.C. Design & Engineering Steel Scope:Miscellaneous steel Completion Year:2014 Category:Commercial Tons of Steel88 TVC Parking Facility 6300 Romaine Street, Los Angeles, CA 95,000 Sq ft concrete parking structure 88 Tons of steel. Item #5

Garfield Corporate Center

Carfield Corporate Center6100 Garfield Ave, Commerce, CA 90040 General Contractor:C.E.G. Construction Architect: O.C. Design & Engineering Engineer: O.C. Design & Engineering Steel Scope:Structural Steel, Miscellaneous steel, Joist & Decking Completion Year:2008 Category:Commercial Tons of Steel400 Garfield Corporate Center 6100 Garfield Ave, Commerce, CA 90040 The project is a 610,000 sq ft concrete tilt-up industrial building.400…

Project-Main

D&M Steel Inc, 2024Los Angeles, CA OWNERD&M Steel Inc ARCHITECTAshan Don COST$203,000,000 TOTAL GROSS SQUARE FEET324,000 Tons of Steel220 Shop DWG Sheet432 Project Completed for D&M Steel Inc, 2024 The project is a new mixed-use building consisting of a new 34-story live-work tower with 475 units, A 6-story office building of 105,000 sq.ft, A 3-story…